picHolder
PLANNING
 box box box box
lines

Central Assembly of God
Columbia, South Carolina
lines
box
The master plan for Central Assembly of God includes four phases for maximizing the use of their existing 13.4-acre site. The first phase adds a new entry drive and parking with a drop off that accommodates future phases and provides the church with a better street presence. The second phase adds a 14,000 SF family life center that includes a gymnasium, locker rooms, church administration offices that is attached to the existing sanctuary building and additional parking. The third phase is a residential drug treatment center located away from the church on the property with beds for 30 people and a program director's apartment. A separate access road provides privacy for the residents and the church. The fourth phase adds a new sanctuary with seating for 800 people and additional parking. The second and third phases are not dependent on each other, allowing maximum flexibility for implementing the master plan.


Services: Master Plan
lines


Mail To

Atlanta
15 Simpson Street
Atlanta, GA 30308
v. 404.688.2200
f. 404.688.2400

Madison
3730 Ross Street
Madison, WI 53705
v. 404.213.2774
f. 404.688.2400


toll-free: 1-877-579-4029

FTP Here